Installation of the core catcher has commenced at Roopur NPP (Bangladesh)
The installation of the device for catching the molten core material (“core catcher”) has commenced at the construction site of power unit No 1 of Roopur NPP. “This is a unique protection system of the NPP and the first large-size equipment that is being installed in the reactor building. Its weight is about 200 tons.…