Installation of the core catcher has started at El-Dabaa NPP Unit 4 (Egypt)
Works for installation of the body of molten corium catcher (the so-called core catcher) of El-Dabaa NPP Unit 4 in Egypt (the General Designer and General Contractor being Rosatom Engineering Division) started on November 19. The core catcher is long-lead equipment. It consists of several elements with the total weight over 700 tons (the weight…