Day: November 22, 2021

  • Steam Generators have been Installed at Rooppur NPP Power Unit 1 (Bangladesh)

    All four steam generators have been installed at the design position at power unit No. 1 of the Rooppur NPP being constructed in the People’s Republic of Bangladesh (by ROSATOM Engineering Division ASE JSC which is the general contractor for the NPP construction) . The Energospecmontazh JSC subcontracting organization’s specialists have carried out assembly operations…