The generator stator is installed in its design position at Rooppur NPP Unit 1 (Bangladesh)
On April 5, installation of the generator stator in its design position has been completed successfully in the turbine hall of Rooppur NPP Unit 1 (ROSATOM Engineering Division being the general designer and general contractor). The works were performed by specialists of VdMU LLC branch office in the People’s Republic of Bangladesh. The generator stator…