Day: December 27, 2021
-
Gazprom holds briefing on operating modes of Russia’s Unified Gas Supply System
Message to the Media December 27, 2021, 15:20 It was noted at today’s briefing that Gazprom’s production complex has been operating in the autumn/winter maximum mode since December 22. This is caused by abnormally low temperatures with daily averages of up to minus 17 degrees Celsius in the areas covered by the UGSS. This is 9 degrees below the climate normal for this period. On the night of December 25 to 26, the temperature in St. Petersburg…
-
Concreting of the last tier of Rooppur NPP Unit 2 (Bangladesh) inner containment has been completed
On December 24, the concreting of the fifth tier of the inner containment of Unit 2 reactor building of Rooppur NPP (Bangladesh) was completed (General Designer and General Contractor – ROSATOM Engineering Division). It took the specialists of Trest RossSEM LLC 23 hours of uninterrupted work to lay 850 m3 of self-compacting concrete mix. The…