Passive heat removal system installed at Rooppur NPP Unit 2 (Bangladesh)
Works on installation of inner and outer parts of steel structures of the passive heat removal system (PHRS) deflector in the design position were performed in two days at the Rooppur NPP construction site in the People’s Republic of Bangladesh (the general designer and general contractor being the Rosatom Engineering Division). The complexity of this…