Eight heat exchangers of passive heat removal system have been installed at Rooppur NPP Unit 1
Installation of eight heat exchangers of passive heat removal system (PHRS) has been completed at Unit 1 of Rooppur NPP (general designer and general contractor is Rosatom State Corporation engineering Division). Each heat exchanger is a metal structure weighing over 32 tons, 8530 meters long, 5904 сеntimeters wide. The installation was performed at elevation +38.100.…