Innovative development. Interview with Oleg Aksyutin by Gazprom Magazine

Today, Gazprom is active in a whole range of promising areas relating to innovative development. These include such technological innovations as: platform-based borehole geophysical survey systems and homegrown innovative technologies for directional drilling of wells based on a rotary steerable system; advanced methods of enhanced oil and gas recovery, engineering solutions for follow-up development of low-pressure Cenomanian gas deposits and development of deep-lying hydrocarbons and hydromineral raw materials…

ROSATOM experience will be used in industrial and civil construction in Nizhny Novgorod Region

JSC Atomenergoproekt (company of the Engineering Division of ROSATOM) and the Ministry of Construction and Development of Agglomeration of Nizhny Novgorod Region have concluded an agreement on cooperation in development and promotion of information model technologies in the field of industrial and civil construction in the region. In accordance with the agreements, the Engineering Division…

Electric power from the ROSATOM’s Karmalinovskaya Wind Farm have entered the wholesale market

The Karmalinovskaya wind farm began supplying electric power and capacity to the wholesale electric power and capacity market from April 1, 2021. The Karmalinovskaya wind farm located in the Stavropol Krai, with an installed capacity of 60 MW, includes 24 wind turbine generators. Local content of facility equipment, as confirmed by the Ministry of Industry…

Severstal cofirms that its Cherepovets Steel Mill eergy strategy will sigificatly reduce Scope 2 emissios

April 1, 2021 PAO Severstal, one of the world’s leading vertically integrated steel and mining companies, has completed the development of a detailed energy efficiency strategy which will help the Company to increase its own energy generation and reduce Scope 2 emissions. Reducing Severstal’s overall consumption of natural gas, gas flaring and the purchase of…

Russian ambassador to Bolivia visits the construction site of the Center for Nuclear Technology Research and Development (CNTRD) in El Alto

March 24 – Mikhail Ledenev, the head of the Russian embassy at the Plurinational State of Bolivia, and the representatives of the Bolivian Ministry of International Affairs accompanied by Alexey Altynov, Vice President of JSC Rusatom Overseas, visited the construction site of the Center for Nuclear Technology Research and Development (CNTRD) in El Alto located…

Document signed on main terms of prospective EPSS contract with Linde for Gas Processing Complex in Ust-Luga

Background Linde plc is one of the world’s largest companies focused on industrial technologies for natural gas treatment and separation with the recovery of ethane, propane and heavier hydrocarbon fractions. In addition, the company designs and builds cryogenic facilities for natural gas and helium liquefaction. Linde Engineering is an engineering and technical subdivision of Linde. Gazprom and RusGazDobycha are implementing the project for…

ROSATOM began manufacturing passive core flooding systems for Akkuyu NPP Unit 1 (Turkey)

The Volgodonsk Branch of JSC AEM-technology (part of ROSATOM machine-building division Atomenergomash) has started a new project manufacturing Passive Core Flooding System Tanks for the Akkuyu NPP Unit 1 (Turkey). Atommash will manufacture the Passive Core Flooding System Tanks for Units 1 and 3 of the Akkuyu NPP under construction. Each Passive Core Flooding System…

Gazprom and YaNAA agree to extend cooperation to 2021–2023

March 25, 2021, 13:50 A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Dmitry Artyukhov, Governor of the Yamal-Nenets Autonomous Area (YaNAA), took place today via a video link. The parties discussed relevant issues of cooperation. The Company is developing a major gas production center on the basis of the Bovanenkovskoye field in the Yamal Peninsula. Pre-development of the second key field in the region, Kharasaveyskoye, is underway, and geological…

Gazprom adds over 480 billion cubic meters to its gas reserves through geological exploration in 2020

March 24, 2021, 11:05 Gas reserve addition rates have been surpassing production rates for 16 consecutive years. The Gazprom Board of Directors took note of the information about the ongoing work for resource base support, geological surveys, and geological exploration performed by the Company. It was highlighted that Gazprom, which has the largest reserves and output of natural gas in the world, is effectively expanding…

Gazprom continuing to enhance corporate governance quality

March 24, 2021, 10:35 The Gazprom Board of Directors took note of the information about the current state of corporate governance, corporate ethics, and transparency of activities at Gazprom. It was highlighted that year after year the Company systematically enhances its corporate standards taking into account, inter alia, the opinions of the investment and expert community. As a result, the corporate governance system conforms to the listing…

Debt for gas supplies reduced in most Russian regions in 2020

March 24, 2021, 10:25 Leaders in debt reduction include the Moscow, Ulyanovsk and Volgograd Regions, the Republic of Tatarstan, and the Astrakhan Region. Heat suppliers are increasing the level of their payments and reducing their debt. At the same time, debt remains a pressing issue in the development of the domestic gas market. The Gazprom Board of Directors took note of the information on improving the payment…

Gazprom reduces greenhouse gas emissions and saves 3.92 million tons of fuel equivalent on fuel and energy in 2020

March 24, 2021, 09:45 Greenhouse gas emissions reduced by 14 per cent against 2019. 3.27 billion cubic meters of natural gas and 305.9 million kWh of electricity saved. Gazprom and Gazprom Neft rank first among Russian oil and gas companies according to the international climate rating compiled by CDP. The Gazprom Board of Directors approved the Company’s ongoing efforts for environmental protection, energy efficiency enhancement,…

Anton Dzhalyabov put in charge of Gazprom Dobycha Noyabrsk

March 22, 2021, 19:00 Anton Dzhalyabov has been appointed Director General of Gazprom Dobycha Noyabrsk. Anton Dzhalyabov was born in 1980. He graduated from Ufa State Petroleum Technological University, majoring in Oil and Gas Field Development and Operation. He has been employed with Gazprom for 19 years. Between 2002 and 2020, he rose through the ranks from Oil and Gas Production Operator to Head…

Unit 6 of Leningrad NPP commissioned for commercial operation

On March 22, 2021, VVER-1200 reactor-enabled Unit 6 was commissioned at the Leningrad NPP. Andrey Petrov, Director General of Rosenergoatom (part of the Electric Power Division of ROSATOM), signed the corresponding order. Pilot operation with 15-day comprehensive tests preceded the unit’s commissioning. On March 10, following the tests, Russian nuclear watchdog Rostechnadzor confirmed the facility…

Gazprom and TMK discuss their cooperation after merger of TMK and ChelPipe

March 19, 2021, 19:30 A working meeting between Alexey Miller, Chairman of the Gazprom Management Committee, and Dmitry Pumpyansky, Chairman of the Board of Directors of TMK, took place today in St. Petersburg. During the meeting, Dmitry Pumpyansky informed Alexey Miller of the results of the deal on the purchase of assets of Chelyabinsk Pipe Rolling Plant (ChelPipe) by TMK. The parties discussed the issues of long-term cooperation, in particular,…

Alexey Miller and Alexander Beglov, Governor of St. Petersburg, discuss cooperation in creation of advanced urban environment

Background Gazprom and the Government of St. Petersburg sign cooperation contracts in furtherance of the Agreement of Cooperation concluded between them. The Agreement to expand the use of natural gas as a vehicle fuel and the Roadmap of the project for the expanded use of hi-tech products of St. Petersburg enterprises in the interests of the Company were also signed between Gazprom and St. Petersburg. As of January 1, 2021,…

Comprehensive Program for reconstruction and re-equipment of processing facilities for years 2021–2025 approved

Background To date, Gazprom’s main processing facilities are the Astrakhan Gas Processing Plant (GPP), the Orenburg gas processing and helium plants, the Sosnogorsk Gas Processing Plant, the Surgut Condensate Stabilization Plant, and the Urengoy Condensate Treatment Plant. The five-year Comprehensive Program for the reconstruction and re-equipment of gas and liquid hydrocarbon processing facilities was approved by Gazprom for…

Gazprom reviews hydrogen energy development areas

March 18, 2021, 15:20 The Gazprom Management Committee addressed the issue of hydrogen production and utilization, as well as export of hydrogen and methane-hydrogen mixtures with the use of the existing gas infrastructure. It was noted that in recent times many countries view hydrogen energy as an area essential for the implementation of national low-carbon development strategies. At the same time, hydrogen is a secondary energy source, i.e. additional energy…

Gazprom and Shell expanding cooperation

March 16, 2021, 17:30 Today, Gazprom and Shell signed an Agreement of Strategic Cooperation for a five-year period. The signing ceremony was held via a video link in the presence of Alexey Miller, Chairman of the Gazprom Management Committee, and Ben van Beurden, Chief Executive Officer of Royal Dutch Shell. The newly signed document expands the interaction between the two companies. Particular attention…

Subsidiary of TVEL Fuel Company of ROSATOM contracts supplies of nuclear fuel components for research reactor in Egypt

Novosibirsk Chemical Concentrates Plant (NCCP, an enterprise of TVEL Fuel Company of ROSATOM) and the Egyptian Atomic Energy Agency (EAEA) signed the contractual documents for supplies of another batch of the low-enriched fuel components to Egypt in 2021. The supplies are carried out under the long-term frame contract for exports of Russian-made nuclear fuel components…

The Engineering Division starts vaccination of employees at overseas construction sites against COVID-19

The Engineering Division of ROSATOM has started vaccination of employees at overseas construction sites against coronavirus infection. The first to receive a batch of Sputnik V medication were the employees of Rooppur NPP construction site (the People’s Republic of Bangladesh). A team of medical workers from Federal Medical and Biological Agency arrived in Bangladesh the…

Gazprom, RusGazDobycha and NIPIGAZ make decision to terminate EPC contract for Ust-Luga Gas Processing Complex

Background Gazprom and RusGazDobycha are implementing the project for a natural gas processing and liquefaction complex near the settlement of Ust-Luga, with the RusKhimAlyans special-purpose company as the project operator. It is the anchor project of the major gas processing and chemical cluster that is being established in the region. The complex will have the largest capacity in Russia in terms of gas processing and will…

Rostechnadzor issued the statement of conformance of Unit 6 of Leningrad NPP to requirements of technical regulations and project documentation

On March 10, Head of the North European Interregional Department for Supervision over Nuclear and Radiation Safety of Rostechnadzor Sergey Perevoshchikov delivered the statement of conformance of Unit 6 to requirements of technical regulations and project documentation to Director of Leningrad NPP Vladimir Pereguda. The day before, the final 15-day integrated tests of the new…

Gazprom delegation’s working visit to Mongolia

March 11, 2021, 11:55 Flight made along the proposed route of the Soyuz Vostok gas pipeline. Action plan of the Joint Working Group for 2021–2022 signed. A Gazprom delegation headed by Vitaly Markelov, Deputy Chairman of the Company’s Management Committee, paid a working visit to Mongolia. The visit involved a flight along the proposed route of the Soyuz Vostok gas pipeline, which will become…

Construction of Akkuyu NPP Unit 3 (Turkey) Begins

10 March, 2021, Büyükeceli (Mersin Province, Turkey) – A ceremony commemorating the start of Unit 3 construction was held at the site of the first Turkish nuclear power plant Akkuyu. Russian President Vladimir Putin and Turkish President Recep Tayyip Erdogan joined the ceremony via videoconference. Energy and Natural Resources Minister Fatih Dönmez, ROSATOM Director General…

ROSATOM subsidiary acquires 49% stake in Korean power storage company

RENERA LLC, ROSATOM’s integrator company for the energy storage business (subsidiary of TVEL Fuel Company of Rosatom) has finalized the deal to acquire 49% share of Enertech International Inc, a South Korean manufacturer of electrodes, lithium-ion storage cells and energy storage systems.  The signed agreement also includes building a facility for manufacturing of lithium-ion cells…

Alexey Miller discusses gas cooperation with Vladimir Semashko and Viktor Karankevich

March 5, 2021, 17:40 A working meeting of Alexey Miller, Chairman of the Gazprom Management Committee, with Vladimir Semashko, Ambassador Extraordinary and Plenipotentiary of the Republic of Belarus to the Russian Federation, and Viktor Karankevich, Minister of Energy of the Republic of Belarus, took place today in Moscow. Particular attention at the meeting was paid to the ongoing heating season. It was noted that Gazprom is reliably providing Belarus…

ROSATOM’s plant launches new manufacturing site for CFR-600 (China) fuel fabrication

Elemash Machine-building plant (an enterprise of ROSATOM’s TVEL Fuel Company in Elektrostal, Moscow region) has launched a production site for fuel fabrication for the CFR-600 reactor, China’s flagship project in the field of fast neutron reactors. The enterprise has modernized the whole shop-floor for fast reactors, which involved development and installation of unique equipment. The…

Ramping up capacities. Interview with Igor Krutikov by Gazprom Magazine

March 2, 2021 Published in corporate Gazprom Magazine Issue 1–2, interview conducted by Olga Zhivaya Igor Krutikov, Director General of Gazprom Dobycha Noyabrsk, answers questions from Gazprom Magazine Mr. Krutikov, for the last few years, the creation of the Yakutia gas production center has been an area of close focus. What does this project mean to you personally? First of all, it is a tremendous experience: a cutting-edge industrial…

ROSATOM has become one of the five top most environmentally responsible Russian companies according to Forbes

ROSATOM has become one of the five top most environmentally responsible Russian companies according to Forbes. This is the first rating of environmental responsibility compiled by the magazine. In its activities ROSATOM seeks improvement of quality of living in accordance with the global agenda of sustainable development. With that, the most important aspect of sustainable…

Gazprom strengthening its gas processing business

February 17, 2021, 10:00 High-capacity facilities are under construction in eastern and western Russia. Amur GPP construction project is 72 per cent complete. The Gazprom Board of Directors expressed its approval of the Company’s ongoing efforts on expanding gas processing facilities and promoting cutting-edge technologies in the segment. It was noted that Gazprom is actively strengthening its gas processing business, primarily due to the growing share of multi-component…

Gazprom continues to expand Sakhalin – Khabarovsk – Vladivostok gas pipeline

February 17, 2021, 09:55 The Gazprom Board of Directors took note of the information about gas supplies to the Khabarovsk Territory. It was highlighted that, in compliance with the Directives of the Government of the Russian Federation “On gas supplies to the Khabarovsk Territory from 2025,” the Company is expanding the Sakhalin – Khabarovsk – Vladivostok gas trunkline at the section between Komsomolsk-on-Amur and Khabarovsk. Over 315 kilometers of the linear part – more than 3/4 of…

ROSATOM started manufacturing equipment for Xudapu NPP (China)

Volgodonsk branch of AEM-technology (a part of ROSATOM machine-building division) have started manufacturing essential equipment for Xudapu NPP Unit 3.   AEM-technology will manufacture and deliver two Generation III+ VVER-1200 reactor facilities, two sets of steam generators, reactor coolant pump set, main circulation piping bodies and two pressurizers.  The total weight of the items will…

Rostechnadzor issued the license to build BREST-OD-300 reactor

The Federal Environmental, Industrial and Nuclear Supervision Service (Rostechnadzor) gave JSC SCC the license for building of the world’s first pilot demonstration power unit with a lead-cooled fast neutron reactor BREST-OD-300 which uses mixed uranium-plutonium nitride fuel and integrated design. The license was signed by Head of Rostechnadzor Aleksei Aleshin on February 10.  “First of…

Issues of cooperation with Republic of Belarus reviewed

February 12, 2021, 16:18 A working meeting between Alexey Miller Chairman of the Gazprom Management Committee, and Vladimir Semashko, Ambassador Extraordinary and Plenipotentiary of the Republic of Belarus to the Russian Federation, took place today in St. Petersburg. It was noted at the meeting that Gazprom, as usual, is reliably providing Belarusian consumers with the required amounts of gas amid peak winter demand. The parties discussed issues of cooperation…

PIK reactor is put into energy operation mode

On February 8, 2021, on the Day of Russian Science, PIK neutron reactor was put into power operation at the National Research Center Kurchatov Institute in St Petersburg Institute of Nuclear Physics (PNPI) with president of the Kurchatov Institute Mikhail Kovalchuk and ROSATOM Director General Alexey Likhachev attending the launch. The unique features of neutron…