Unit 2 of Belarus NPP has reached minimum controllable power level
On March 25, the reactor of Power Unit 2 of Belarus NPP (general designer and general contractor is Rosatom State Corporation Engineering Division) was brought to minimum controllable power level. At 19:42 (Moscow time), the neutron flux was registered for the first time, and controlled self-sustained nuclear reactor began. Achievement of the minimum controllable power…