Unit No. 1 at the Belarusian Nuclear Power Plant has been brought to minimum control power
11th October 2020 2:26 a.m. Ostrovets, Belarus – Unit No. 1 at the Belarusian Nuclear Power Plant, equipped with the VVER-1200 reactor has been brought to minimum control power (MCP). Minimum control power level is reached when neutron flux is recorded in a reactor working at a level sufficient to sustain a fission chain reaction. …
Details